What are the differences between the Evaluation and Modelling modes?

Engage Process distinguishes different phases in the process mapping activities. Since the presentation of a process during its modeling phase can be different than the presentation during its evaluation phase we have introduced different view modes. In the Modeling view mode, some features concerning evaluation are hidden. In the Evaluation view mode, Results properties are added to the Property pane. Additionally, the Show measures pane appears and the measures values are presented on the process diagram.

You can switch between these view modes by pressing one of the buttons in the View modes group of the View tab.

 

ViewModes

 

Alternatives :

Use small buttons in front of the slider in the right bottom corner of the Engage Process Modeler window.

 

 

ViewModes2

 

Engage Process Modeler switches automatically to the Evaluation view mode when the Evaluate process or Evaluate path button is pressed in the Analysis tab.